Basement Bathroom Renovation - Yonge St Unit 6, Richmond Hill

Case Study Details

Homeowners searching for a reliable team for a basement bathroom remodel in Richmond Hill often want proof of real local work. This recent project at Yonge St Unit 6, Richmond Hill, ON highlights our ability to deliver functional design, quality craftsmanship, and a smooth renovation experience from start to finish.

The Challenge

The homeowner was dealing with several common issues found in older basement bathrooms across Richmond Hill.

  • Dim lighting that made the space feel smaller and less inviting
  • An inefficient layout that didn’t fully use the available square footage
  • Aging finishes showing wear from regular moisture exposure
  • Limited ventilation causing lingering humidity after use
  • Minimal storage for daily essentials

They wanted a clean, modern basement bathroom with a practical walk-in shower design all completed within the existing footprint and without unnecessary disruption to the home.

Scope of Work

We completed a full basement bathroom renovation including:

  • Careful demolition and disposal of existing fixtures and finishes
  • Plumbing updates for better performance and efficiency
  • Full waterproofing system for long-term moisture protection
  • Walk-in shower installation with modern glass enclosure
  • Wall and floor tile installation with clean finishing
  • Updated lighting for a brighter, open feel
  • Ventilation improvements to control humidity
  • Final detailing and thorough site cleanup after completion

All work was completed by experienced, insured professionals following a clean and organized renovation process.

Project Timeline

Total Duration: 2 Weeks

Week 1 – Demolition, Rough-Ins & Preparation
Careful removal of existing fixtures and finishes. Layout refinements for better functionality. Plumbing and electrical rough-ins completed. Surface preparation for waterproofing and tile work.

Week 2 – Waterproofing, Installation & Finishing
Full waterproofing application. Wall and floor tile installation. Vanity, shower glass, and fixture installation. Lighting, ventilation, and final detailing.

We stayed fully on schedule and delivered the project with an organized, efficient workflow and minimal disruption to the homeowner.