How Long Does a Bathroom Renovation Take in Toronto? (2026)

A bathroom renovation is exciting, but waiting for it to be finished can feel stressful. So, how long does a bathroom renovation take in Toronto? The answer depends on the size of your project, the work involved, and even how early you plan.

Most bathroom renovations take 2 to 8 weeks, but some finish sooner while others take longer. In this guide, you’ll learn what happens at each stage, what can slow things down, and how to keep your project on track. By the end, you’ll know exactly what to expect before your renovation begins.

How Long Does a Bathroom Renovation Take in Toronto? (Quick Answer)

A bathroom renovation in Toronto normally takes 2 to 8 weeks. A simple bathroom update may be done in about 2 to 3 weeks. A full bathroom remodel with new plumbing, electrical work or custom features can take 5 to 8 weeks or more.

The time depends on the size of your bathroom, the work you want done, the materials you choose and whether permits are needed. If you’re renovating a condo, it may take a little longer because of condo rules and booking elevators.

Average Bathroom Renovation Timeline

Project TypeAverage Time
Small bathroom update2–3 weeks
Standard bathroom renovation3–5 weeks
Full bathroom remodel5–8 weeks
Custom or luxury bathroom8+ weeks

These timelines cover the construction work only. Before work starts, you’ll also need time for planning, choosing materials, ordering products, and getting permits if your project needs them. Working with an experienced bathroom renovation contractor in Toronto can help your project stay on schedule and avoid delays.

Bathroom Renovation Timeline in Toronto by Project Type

Not every bathroom renovation in Toronto takes the same amount of time. A small bathroom with a few updates can be finished much faster than a full remodel where walls, plumbing or electrical work need to be changed. The more work you add, the longer the project will take.

The table below gives you a realistic idea of how long different types of bathroom renovations usually take.

Project TypeAverage TimelineWhat’s Included
Cosmetic bathroom update2–3 weeksNew paint, vanity, toilet, faucets, lights, mirror, and hardware
Standard bathroom renovation3–5 weeksNew flooring, tiles, bathtub or shower, vanity, toilet, and fixtures with little or no plumbing changes
Full bathroom remodel5–8 weeksComplete demolition, new plumbing, electrical work, waterproofing, tile installation, and all new fixtures
Luxury or custom bathroom8–10+ weeksCustom vanity, walk-in shower, heated floors, built-in storage, premium tile, and custom glass

A cosmetic bathroom update is the fastest because most of the existing layout stays the same. Since the plumbing and electrical work are not moved, contractors can finish the job more quickly.

A standard bathroom renovation is the most common choice for Toronto homeowners. It gives your bathroom a fresh new look while keeping the same layout, which helps save both time and money.

A full bathroom remodel takes longer because several trades work one after another. Demolition, plumbing, electrical work, waterproofing, tile installation, and inspections all need to be completed in the right order before the next step can begin.

A custom or luxury bathroom renovation usually has the longest timeline. Custom cabinets, special-order tiles, and frameless glass showers often take several weeks to arrive. Since many of these products are made to order, the renovation may pause until everything is delivered.

How Long Does the Planning & Design Phase Take?

The planning and design phase usually takes 1 to 3 weeks, depending on how fast decisions are made. This part happens before any demolition starts and plays a big role in keeping your bathroom renovation timeline on track. Once every detail is planned, the construction team can work without unnecessary delays.

What Happens During Planning?

During this stage, you’ll decide exactly what your new bathroom will look like. This includes the layout, tile style, vanity, shower or tub, lighting, paint colour and other finishes. If you’re happy with the current layout, planning is usually much faster. If you want to move plumbing or walls, extra planning may be needed.

Material Selection and Ordering

One of the biggest reasons projects get delayed is waiting for materials. Some products are available right away, while custom vanities, specialty tiles, and frameless shower glass can take several weeks to arrive. Ordering everything before construction starts helps keep your bathroom renovation in Toronto moving from one step to the next without long pauses.

Do You Need a Permit in Toronto and How Long Does It Take?

Not every bathroom renovation in Toronto needs a permit. If you’re replacing old fixtures with new ones in the same location, such as a toilet, vanity, bathtub or tiles, you usually don’t need a building permit. However, if your renovation includes structural changes or moving plumbing or electrical systems, permits may be required.

When You May Not Need a Permit

Simple bathroom updates often don’t require a permit, including:

  • Replacing a vanity or toilet
  • Installing new floor or wall tiles
  • Changing faucets or shower fixtures
  • Painting or replacing drywall (without structural changes)

These projects can usually start as soon as your materials are ready.

When a Permit May Be Required

A permit may be needed if your project includes:

  • Moving plumbing to a new location
  • Removing or building walls
  • Making structural changes
  • Adding new windows or changing their size
  • Major electrical work that requires inspection

If you’re unsure, ask your contractor before the renovation begins. They can tell you which approvals apply to your project.

How Long Does a Permit Take?

The approval time depends on the type of work and the information submitted with the application. Simple permits may be approved within a few business days, while more complex renovations can take a few weeks. If your project is in a condo, you may also need approval from the condo board, which can add extra time before construction starts.

How Long Does Each Construction Phase Take?

Once all the planning is done and the materials are ready, the construction work can begin. Each step of a bathroom renovation in Toronto must be completed in the right order. Some tasks can only start after the previous one is finished, so rushing the process can lead to problems later.

Construction PhaseAverage Time
Demolition1–2 days
Plumbing & electrical work2–4 days
Waterproofing1–2 days
Tile installation & grouting3–5 days
Painting & ceiling finish1–2 days
Vanity, toilet & fixture installation1–2 days
Final touch-ups & cleanup1 day

Demolition (1–2 Days)

The old vanity, toilet, bathtub or shower, flooring and wall tiles are removed. The contractor also checks for hidden problems like water damage, mould or rotten wood that need to be fixed before new materials are installed.

Plumbing and Electrical Work (2–4 Days)

If new pipes, drains, lighting, outlets or fans are being installed, this work is completed before the walls are closed. Keeping the existing plumbing layout usually helps reduce both time and cost.

Waterproofing (1–2 Days)

A waterproof membrane is applied around the shower, bathtub, and other wet areas. This step protects your bathroom from future water leaks and must be done properly before any tile is installed.

Tile Installation and Grouting (3–5 Days)

Wall and floor tiles are installed first. After that, the grout needs time to dry before the next stage begins. Large tiles or detailed patterns often take longer because they need more careful cutting and spacing.

Painting and Ceiling Finish (1–2 Days)

Once the walls are ready, the ceiling and any painted surfaces are finished. This step is usually completed before the vanity and other fixtures are installed to help achieve a clean finish.

Vanity, Toilet and Fixture Installation (1–2 Days)

The new vanity, sink, toilet, faucets, shower trim, mirrors, and accessories are installed. Everything is tested to make sure it works properly and there are no leaks.

Final Touch-Ups and Cleanup (1 Day)

The contractor completes any small adjustments, checks that doors and drawers open properly, seals around fixtures where needed, and gives the bathroom a final clean before handing it over.

Every bathroom remodel is different, but following these construction phases in the right order helps keep the renovation on schedule and delivers a better-quality finish.

How Long Does a Condo Bathroom Renovation Take in Toronto?

A condo bathroom renovation in Toronto usually takes 3 to 6 weeks for the construction work. However, the full project may take longer because many condo buildings have their own approval process and renovation rules that must be followed before work can begin.

Unlike a house, you’re not only working with your contractor. You also need to follow your condo building’s renovation policies.

Why Condo Renovations Can Take Longer

Every condo building has its own rules. Before construction starts, you may need to:

  • Get approval from the condo management or board.
  • Submit renovation details or contractor information.
  • Book the service elevator for moving materials.
  • Follow the building’s approved working hours.

These steps can add a few days or even a couple of weeks before the renovation starts.

Condo Renovation Timeline

StageAverage Time
Condo approval (if required)A few days to 2 weeks
Construction work3–6 weeks
Final inspection or building review (if required)1–3 days

Tips to Keep Your Condo Renovation on Schedule

A few simple steps can help avoid delays:

  • Check your building’s renovation rules before choosing a start date.
  • Submit all required documents as early as possible.
  • Book the service elevator in advance.
  • Choose a contractor who has experience working in Toronto condos.

Condo delays happen before demolition even begins. Once approvals are complete and the building schedule is confirmed, the renovation usually moves much more smoothly. Planning ahead is one of the easiest ways to keep your bathroom renovation timeline on track and avoid unexpected waiting time

Frequently Asked Questions About Bathroom Renovation Timeline in Toronto

  1. How long does a full bathroom renovation take in Toronto?

    A full bathroom renovation in Toronto usually takes 5 to 8 weeks for construction. The exact timeline depends on the size of the bathroom, plumbing or electrical changes, custom materials, and permit requirements. Planning, product ordering, and approvals may add extra time before construction begins.

  2. Can a bathroom renovation be completed in two weeks?

    Yes, but only for small bathroom updates. If you’re replacing fixtures, painting, or installing a new vanity without changing the layout, the work may be finished in about two weeks. A full bathroom remodel with plumbing, tiling, or electrical work usually takes much longer.

  3. What is the longest part of a bathroom renovation?

    Tile installation is often the longest part of a bathroom renovation. Tiles need careful installation, grout must dry properly, and waterproofing must be completed before tiling begins. Custom products, such as shower glass or vanities, can also extend the overall renovation timeline if delivery is delayed.

  4. Can I use my bathroom during the renovation?

    In most cases, you won’t be able to use the bathroom during a full renovation. The toilet, sink, shower, and plumbing are usually removed while the work is being completed. If it’s your only bathroom, plan to use another bathroom or arrange temporary access during the project.

  5. What can delay a bathroom renovation in Toronto?

    The most common delays include hidden water damage, mould, permit approvals, custom material backorders, and changes made after construction starts. Choosing materials early, making design decisions before work begins, and hiring an experienced bathroom renovation contractor can help keep your project on schedule.