Bathroom Renovation Toronto | 242 David French Ln Project

Case Study Details

If you’re searching for a bathroom renovation in Toronto near Don Mills, this recently completed project at 242 David French Ln showcases how our team transformed a compact 5×8 ft bathroom into a modern, efficient space with improved lighting, waterproofing, and storage.

The homeowner wanted to replace an outdated tub-shower setup with a clean walk-in shower design, modern fixtures, and durable tile finishes that would be easier to maintain in the long term.

Our renovation team completed the project with a focus on quality workmanship, moisture protection, and practical design improvements that make everyday use more comfortable.

The Challenge

During the initial inspection, several issues were identified that are common in many older Toronto bathrooms:

  • Cracked grout and worn tile surfaces allowing moisture to penetrate behind the wall tiles – a key reason proper waterproofing is essential from the start
  • Outdated tub-shower combination making the bathroom feel smaller and less accessible
  • Limited vanity storage causing everyday items to clutter the countertop – a common issue explored in our guide on maximizing bathroom storage
  • Poor lighting around the vanity area
  • Aging ventilation fan that struggled to remove humidity – see why bathroom ventilation matters for long-term moisture control

The homeowner wanted a modern walk-in shower bathroom that would feel brighter, cleaner, and easier to maintain without expanding the bathroom footprint. Read more about small bathroom renovation ideas we use to make the most of compact spaces.

Scope of Work

Our renovation team completed a full bathroom remodel including the following upgrades:

  • Complete demolition of existing bathtub, tiles, and vanity
  • Plumbing adjustments for new walk-in shower layout
  • Professional waterproofing system installation
  • Installation of large-format porcelain wall tiles
  • Slip-resistant porcelain floor tile installation
  • Tub-to-walk-in glass shower conversion
  • Frameless tempered glass shower enclosure
  • Custom recessed shower niche for storage – a detail covered in our creative storage solutions guide
  • Floating vanity with quartz countertop installation
  • LED backlit mirror and upgraded lighting fixtures
  • High-efficiency dual flush toilet installation
  • New ventilation fan for improved airflow

All work was completed by licensed renovation professionals with careful attention to waterproofing and finishing details. Ready to start your own project? Get a free estimate today.

Project Timeline

The renovation was carefully scheduled to minimize disruption while maintaining high installation standards.

Week 1 – Demolition & Plumbing Preparation
Removal of existing bathtub, tiles, vanity, and inspection of plumbing connections. Our bathroom demolition process is handled cleanly with full disposal included.

Week 2 – Waterproofing & Tile Installation
Application of waterproof membrane followed by installation of large-format wall and floor tiles. See how our professional waterproofing system protects bathrooms from long-term moisture damage.

Week 3 – Fixtures & Finishing Work
Installation of vanity, shower glass enclosure, lighting, toilet, and final finishing details.

The project was completed efficiently while ensuring every step met professional renovation standards.